91短视频

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
April 18, 2026 04/17/2026 12:29 PM EDT CSV
April 14, 2026 04/13/2026 12:35 PM EDT CSV
April 15, 2026 04/14/2026 12:26 PM EDT CSV
April 16, 2026 04/15/2026 12:36 PM EDT CSV
April 17, 2026 04/16/2026 12:49 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 04/17/2026 03:10 PM EDT CSV
April 13, 2026 04/13/2026 12:10 AM EDT CSV
April 14, 2026 04/14/2026 11:50 PM EDT CSV
April 15, 2026 04/15/2026 11:25 PM EDT CSV
April 16, 2026 04/16/2026 11:30 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/17/2026 03:03 PM EDT CSV
April 13, 2026 04/13/2026 11:21 PM EDT CSV
April 14, 2026 04/14/2026 11:21 PM EDT CSV
April 15, 2026 04/15/2026 11:18 PM EDT CSV
April 16, 2026 04/16/2026 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/17/2026 12:43 PM EDT CSV
April 12, 2026 04/13/2026 02:20 PM EDT CSV
April 13, 2026 04/14/2026 04:01 PM EDT CSV
April 14, 2026 04/15/2026 11:28 AM EDT CSV
April 15, 2026 04/16/2026 01:46 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/17/2026 12:43 PM EDT CSV
April 12, 2026 04/13/2026 02:20 PM EDT CSV
April 13, 2026 04/14/2026 04:01 PM EDT CSV
April 14, 2026 04/15/2026 11:28 AM EDT CSV
April 15, 2026 04/16/2026 01:46 PM EDT CSV