91短视频

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
April 21, 2026 04/20/2026 12:38 PM EDT CSV
April 17, 2026 04/16/2026 12:49 PM EDT CSV
April 18, 2026 04/17/2026 12:29 PM EDT CSV
April 19, 2026 04/18/2026 12:28 PM EDT CSV
April 20, 2026 04/19/2026 12:19 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 04/21/2026 06:20 AM EDT CSV
April 17, 2026 04/17/2026 10:15 PM EDT CSV
April 18, 2026 04/18/2026 04:35 PM EDT CSV
April 19, 2026 04/19/2026 11:10 PM EDT CSV
April 20, 2026 04/20/2026 11:55 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/21/2026 06:21 AM EDT CSV
April 17, 2026 04/17/2026 11:21 PM EDT CSV
April 18, 2026 04/18/2026 11:21 PM EDT CSV
April 19, 2026 04/19/2026 11:21 PM EDT CSV
April 20, 2026 04/20/2026 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/20/2026 01:34 PM EDT CSV
April 15, 2026 04/16/2026 01:46 PM EDT CSV
April 16, 2026 04/17/2026 12:43 PM EDT CSV
April 17, 2026 04/20/2026 01:08 PM EDT CSV
April 18, 2026 04/20/2026 01:16 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/20/2026 01:34 PM EDT CSV
April 15, 2026 04/16/2026 01:46 PM EDT CSV
April 16, 2026 04/17/2026 12:43 PM EDT CSV
April 17, 2026 04/20/2026 01:08 PM EDT CSV
April 18, 2026 04/20/2026 01:16 PM EDT CSV