"C","91短视频. Operational Capacity Update Report" "C","Filename: morning_report_20260416_20260416120209000.csv" "C","Report for 04/16/2026" "C","Report generated 04/18/2026 02:13:22 EDT" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","04/16/2026","12:02:09" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","04/15/2026","20","14045" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26628 "D","B. Capacity Additions EcoMax > CSO",1251 "D","C. Generation Outages and Reductions (Planned + Forced)",9198 "D","Generation Planned Outages and Reductions",6705 "D","Generation Forced Outages and Reductions",2493 "D","D. Uncommitted Available Generation (Non-fast start)",2673 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",60 "D","E. DRR Capacity",190 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",0 "D","NB",-2 "D","NECEC",0 "D","NY91短视频 AC",-98 "D","NY91短视频 CSC",330 "D","NY91短视频 NNC",0 "D","Phase 2",0 "D","Net Deliveries",230 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",15956 "D","I. Peak Load Forecast For Hour Ending20",13830 "D","J. Total Operating Reserve Requirement",1875 "D","K. Capacity Required = I + J",15705 "D","L. Surplus = (+) Deficiency = (-) (H - K)",251 "D","M. Replacement Reserve Requirement",160 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",91 "D","Section 4. Largest First Contingency MW",1244 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",16460 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1493 "D","Ten Minute Reserve Estimate:",1493 "D","Thirty Minute Reserve Requirement:",382 "D","Thirty Minute Reserve Estimate:",633 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",0,0,0 "D","NB",-650,400,-2 "D","NECEC",0,0,0 "D","NY91短视频 AC",-1600,1200,-98 "D","NY91短视频 CSC",-346,330,330 "D","NY91短视频 NNC",0,0,0 "D","Phase 2",-300,1200,0 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Thunderstorm","SE-9",54 "D","Hartford","Thunderstorm","S-9",74 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"